National Yacht Club

 

DUN LAOGHAIRE HARBOUR CRUISE BERTH APPEAL – AN BORD PLEANÀLA DECISION

Facebooktwitterredditpinterestlinkedintumblrmaildun-laoghaire-cruise-terminal-390x285 Grant of Permission for Dun Laoghaire Harbour Development (06D.PA0042) Publication Date: 3rd November, 2016 The Board has concluded its consideration of the proposed construction of a cruise berth facility at Dun Laoghaire Harbour, Dun Laoghaire, Co. Dublin. The Board’s decision is to grant permission with conditions for the proposed development. An eight year permission with conditions was granted for construction of a cruise berth and access causeway, dredging of a navigation channel and associated works.   The conditions include a reduction in the scale of the proposed berth to accommodate vessels with a maximum length of 250 metres length overall (LOA) at Dun Laoghaire Harbour. The key documents relating to the Board’s decision are, as follows: Bord Decision Bord Order Costs Determination Directors Decision Inspectors Report Oral Hearing Inspectors Report The Harbour planning application can be viewed here